MED607 Infrastructure Upgrades on 2nd Ave. & Surrounding Areas, September 5-7

Thursday, September 5, 2019

09/05/19 - 09/07/19

Infrastructure Upgrades on 2nd Ave. & Surrounding Areas 
 
PROJECT #: MED607 
BOROUGH: MANHATTAN 
DATE ISSUED: 09/05/19
 
The following is an anticipated work schedule for the upcoming week. However, due to unforeseen field and weather conditions, it may become necessary to change some scheduled work locations, operations and dates.
 
Saturday work to be determined on 09/07/19; also take note that the city contractor does have permits that allow him to work until 10pm if needed.
 
For further information: Contact Karen Flores, the Community Construction Liaison at (646) 768-9105 or 2ndaveccl@gmail.com
 
 
DATE  TIME  LOCATION  OPERATION
9/5/19 -
9/7/19
7am – 3:30pm 3rd Ave. at East 35th St Utility (Gas) work – trench excavation
9/5/19 -
9/7/19
7am – 3:30pm 3rd Ave. between E. 33nd St. and E. 34th St. Excavate and install distribution water main & gas main pipes 
9/5/19 -
9/7/19
 7am – 3:30pm 3rd Ave. between E. 34th St. & E. 35th St. Continue the removal of steam main
9/5/19 -
9/7/19
 7am – 3:30pm 2nd Ave. at E. 35th St. Utility (Gas) Work- Tie-in new gas main to existing main
 