Infrastructure Upgrades on 2nd Ave. & Surrounding Areas April 13-20

Friday, April 12, 2019

Infrastructure Upgrades on 2nd Ave. & Surrounding Areas 
 
PROJECT #: MED607 
 
BOROUGH: MANHATTAN 
 
DATE ISSUED: 4/12/19
 
The following is an anticipated work schedule for the upcoming week. However, due to unforeseen field and weather conditions, it may become necessary to change some scheduled work locations, operations and dates.
 
Please see Saturday hours for 4/13/19 and 4/20/19 take note that the city contractor does have permits that allow work to proceed until 10pm if needed.
 
For further information: Contact Karen Flores, the Community Construction Liaison at (646) 768-9105 or 2ndaveccl@gmail.com
 
DATE TIME LOCATION OPERATION
*4/13/19 8am – 10pm 2nd Ave. & E. 36th St. Backfill 20 inch Gas Main Trench & Temporarily Pave Roadway
*4/13/19 8am – 10pm E. 35th St. between the QMT Exit & 2nd Ave. Install Catch Basin & Chute Connection
4/15/19 - 4/19/19 7am – 3:30pm 2nd Ave. bet E. 35th St. & E. 36th St. Install New Electric Conduit & Connect the New Gas Pipe to the Existing Gas Pipe
4/15/19 - 4/19/19 7am – 3:30pm 3rd Ave. bet E. 34th St. & E. 35th St. Connect the New Gas Pipe to the Existing Gas Pipe & Backfill 20 inch Gas Main Trench
4/15/19 - 4/19/19 7am – 3:30pm 1st Ave. bet E. 35th St. & E. 36th St. Install New Electric Conduit
4/15/19 - 4/19/19 7am – 3:30pm 2nd Ave. & E. 35th St. (southwest corner) Install Catch Basin
4/15/19 - 4/19/19 7am – 3:30pm 3rd Ave. at E. 35th St. Backfill 12 inch Gas Main Trench
*4/20/19 8am – 10pm E. 35th St. between the QMT Exit & 3rd Ave Con Edison Test Pit for Steam

 

RELATED DOCUMENTS

DDC flier

RELATED SITES

DDC Website

 

Join The Murray Hill Neighborhood Association

Be involved in the preservation, beautification and improvement of this very special neighborhood, and receive discounts at some of the finest Murray Hill restaurants and merchants.


Join Today